Energy conservation opportunities at the defence forces memorial hospital.
Abstract
A study on energy conservation measures was conducted at the Defence Forces
Memorial Hospital (DFMH) to identify opportunities which would cut down on the
overall energy cost. This was guided by evaluation of energy cost distribution among
the utilities in use. The biggest cost at 68 % of the total energy cost was out of
electricity, 16 % diesel and 16 % LPG in 2017; 66 % electricity, 17 % diesel and 17
% LPG in 2018; 72 % electricity, 21 % LPG and 7 % diesel in 2019.
The study narrowed down on the energy sources, lighting, water heating systems and
incinerator, refrigeration and air conditioning, electrical motors and generator and
laundry equipment. The main objective of the project was to perform a level II energy
audit of the hospital which entailed reviewing energy bills, determining energy losses
in the lighting system, assessing energy losses in water heating system and
incinerator, evaluating refrigeration and air conditioning overall efficiency, evaluating
electrical motors and generator performance efficiency, determining the power losses
of the laundry equipment, identifying energy saving opportunities in the areas of
focus and performing a cost-benefit analysis for identified energy saving
opportunities.
The method of executing the research project involved audit planning, general data
acquisition, equipment testing and measurements, analysis of raw data and
recommendations on energy conservation opportunities. The economic tools for
determining the financial savings included the following: Capital Investment, Annual
Financial Saving, PBP and ROI where possible while for the energy conservation
opportunities, energy consumption technique was applied. The analysis identified
that; in lighting, replacing all the 918 Fluorescent tubes with LED lights would result
to payback periods of averagely less than 1 year, in the water heating system, the
boiler was found to be underutilized with an output of 366.34 kJ/s and its current
usage was 51.04 kJ/s. Instant showers were found to be consuming 187,447.5 kWh
per year. The waste heat energy in the incinerator was found to be 490.42 kJ/s. For the
HVAC system, one of the equipment was oversized at 4.6 kW, hence replacing it with
the correct size would save the hospital Kshs 290,152.80 per year with a payback
period of 1 year 11 months. It was also found that laundry and boiler feed water
pumps motors had operating efficiencies below 75 % and would require regular
maintenance and servicing. It was also notable that the same machines had low power
factors which required appropriate measures to improve, example by insertion of
capacitors for power improvement. The generator performance efficiency was 34.4 %.
Power failure of the utility company (KPLC) costed the DFMH a loss of Kshs
130,489.60 (17 %) per year. In the laundry, the washer extractors and dryers
consumed 608 kWh and 816 kWh per day respectively. If replaced with more
efficient machines, financial savings of Kshs 1,527,120 and Kshs 3,406,495.70 per
year for washer extractors and dryers respectively would be realized, with payback
periods of 3 years 3 months and 2 years 6 months respectively.
For the power quality, the maximum Total Harmonic Distortion (THD) was found to
be 2.17 % which is within the recommendation of < 5 % according to IEEE Std 519-
1998.
Publisher
University of Nairobi
Rights
Attribution-NonCommercial-NoDerivs 3.0 United StatesUsage Rights
http://creativecommons.org/licenses/by-nc-nd/3.0/us/Collections
The following license files are associated with this item: