dc.description.abstract | Preparation of a series of cadastral maps and distribution of the land ownership certificates to each
landowner of the whole kingdom of Nepal has been completed recently. However, half of the cadastral
mapping of the country was carried out without the national coordinate system references and attention has
given to map the private cultivated land, public land and government land with settlements during the
cadastral surveying and mapping of the country. During the cadastral mapping of the country, it was
realized that a national system of geodetic network of different order of ground control is required to
prepare the large scale map of the whole of the kingdom of Nepal. Everest spheroid 1830 and UTM
(modified with three degree zone) projection system was selected for the geodetic reference and the higher
order and lower order geodetic control networks was established with the traditional geodetic survey
equipment i.e., theodolite and distance meter. | en |