Show simple item record

dc.contributor.authorMulaku, G. C
dc.contributor.authorWakoli, P.C. M
dc.contributor.authorKiema, J. B.K
dc.date.accessioned2013-06-20T15:11:32Z
dc.date.available2013-06-20T15:11:32Z
dc.date.issued2008
dc.identifier.citationMulaku, G. C.; Wakoli, P.C. M.; Kiema, J. B.K (2008). Re-alignment of a guyed tower. Survey Review, Volume 40, Number 308, April 2008 , pp. 135-141(7)en
dc.identifier.urihttp://www.maneyonline.com/doi/abs/10.1179/003962608X253646
dc.identifier.urihttp://erepository.uonbi.ac.ke:8080/xmlui/handle/123456789/37004
dc.description.abstractTowers are typical structures that can be found in many urban and rural landscapes the world over. From their basic design, they are usually exposed to severe environmental loads. It is therefore prudent to carry out periodic maintenance that includes checking that they are correctly aligned. This paper describes a method that was used for the re-alignment of a guyed tower in Limuru, Kenya. Angular and distance observations, made from two observation points detected a vertical misalignment that was larger than the acceptable tolerance of 1/400. An iterative re-alignment procedure was then applied, resulting in an acceptable final misalignment of 1/520.en
dc.language.isoenen
dc.titleRe-alignment of a guyed toweren
dc.typeArticleen


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record