Show simple item record

dc.contributor.authorMitullah Winnie V
dc.date.accessioned2013-06-24T09:44:27Z
dc.date.issued2011
dc.identifier.urihttp://repository.up.ac.za/bitstream/handle/2263/17315/Chitere_Paratransit%20%282011%29.pdf?sequence=1
dc.identifier.urihttp://hdl.handle.net/11295/38860
dc.description.abstractEfficient and effective operations of the paratransit public transport services such as Matatus as businesses in t he city of Nairobi depends on availability of a dequate termini and routes with sufficient facilities and management services. This study sought to find out whether the termini and routes in the city enable d efficient operations of matatus . It was found that there were 34 termini, a few of which were authorized while a large number were located on the streets and lacked basic facilities such as toilets and water. There wa s congestion of matatus at the termini and on the routes which increased their oper ati ng costs . To ensure efficient operations, the government should ensure transiting from low - to high - occupancy vehicles , concessioning of routes to well established operators and establishment of more termini on the city ’s outskirtsen
dc.language.isoenen
dc.publisherUPSpaceen
dc.titleParatransit operations in Nairobi: development of their routes and terminien
dc.typeWorking Paperen
local.embargo.terms6 monthsen
local.embargo.lift2013-12-21T09:44:27Z
local.publisherInstitute for Development Studies, University of Nairobien


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record